The Department continually monitors the condition of roads throughout the province for the purpose of planning, maintenance and reconstruction. In 2006, approximately 60 % of the paved road network was measured by “road roughness testing”, dynamic cone penetration (DCP) and evaluation of skid resistance.

The Departmental technical centre also conducted research with a view to locating mapping and evaluating material sources for road building in the province. A number of material sources have been tested for suitability.

The Department continues to use the bridge management software programme developed by the CSIR to manage 1,610 bridges and 2,008 culverts in the province. In 2006 a visual inspection of 323 bridges and 267 culverts was conducted.

The department uses the Road Management System (RMS) to provide a scientific basis for evaluating the condition of paved and unpaved road networks. Pavement Management Systems (PMS) and Gravel Road Management Systems (GRMS) are also used.